For WSU News and WSU Today content older than July 2018, search the WSU News Archive.

WSU News Archive   Return to WSU News Home

National Institute for Research and Digitial Transformation

May 6, 2022 — The steel columns and beams rising on the east edge of the Innovation Campus will soon provide a physical centerpiece for the ongoing work of digital transformation at Wichita State University. The National Institute for Research and Digital Transformation will occupy the building at 18th Street and Oliver by spring 2023.

The new entrance to Wichita State campus on the corner of 21st and Oliver streets.

Feb. 18, 2022 — The entrance to Wichita State University’s Innovation Campus on the corner of 21st and Oliver streets is about to get a Shocker makeover with new signage and landscaping.

Wichita State Campus

Feb. 15, 2022 — In the next steps toward the creation of the University Village, Wichita State University is seeking public feedback and engagement on the lead proposals.

Juan Aguilar is standing outside behind a metal sculpture.

Feb. 7, 2022 — Four years ago, Juan Aguilar made a decision that is about to make his last two years in college a whole lot more affordable.

A Wichita State student welds as part of a class project at GoCreate located at the Innovation Campus.

Jan. 24, 2022 — Further expanding its presence as a diverse creative workspace at WSU, GoCreate recently began offering free memberships to Wichita State students.

Woolsey Hall

Sept. 13, 2021 - Student feedback helped guide the design of Frank and Kay Woolsey Hall. They asked for collaboration, and they asked for caffeine. Woolsey Hall, the new home for the W. Frank Barton School of Business, is 30 to 40 percent finished and expected to be complete in late spring 2022 and ready for summer 2022 classes.

Innovation Campus

Aug. 11, 2021 - People are returning to the Wichita State University campus as summer continues and the fall semester approaches. If you’re a newcomer – or feel like it’s been a while – you’ll notice construction and new businesses on campus.

A rendering of the future Promise Bridge

Aug. 2, 2021 — The marquee exterior fixture of the W. Frank Barton School of Business’ new home, Wayne and Kay Woolsey Hall, has been officially named the Promise Bridge. The 300-foot-long pedestrian bridge will span a water feature south of the building.

Rafael Leite and Felipe Lima de Oliveira

June 22, 2021 — When the Make48 invention and maker challenge comes to Wichita State University on June 24, two of the eight Wichita teams are comprised entirely of Wichita State University students.

NIAR

June 21, 2021 — A widely acclaimed program for aircraft inspection, maintenance and airworthiness research is landing at Wichita State University’s National Institute for Aviation Research (NIAR) after a 30-year history at Sandia National Laboratories.

Wichita State University engineering students present Ford Hall with a bicycle they modified to meet his needs.

June 7, 2021 — Five-year-old Ford Hall has had to overcome more in his short life than most do in a lifetime. That’s because immediately after he was born, he was diagnosed with cerebral palsy. The doctors informed his mother he would probably never be able to walk. “It was that conversation with that doctor that really lit a fire in us,” said Cori Hall, Ford’s mother.

B-1B arrives at Wichita State

June 7, 2021 — The Air Force Life Cycle Management Center B-1 Division is sponsoring a research project with Wichita State University’s National Institute for Aviation Research to study the effects of flight operations on aircraft structures.

FirePoint

May 20, 2021 — The FirePoint Innovations Center at Wichita State University has welcomed the first class of students into its Future Innovators Program, a new engineering internship opportunity aimed at introducing historically underrepresented students into the U.S. Department of Defense’s (DoD) technical talent pipeline.

Social Tap Drinkery partners

April 23, 2021 - By mid-July, Neel and partners Luke Luttrell and David Hopkins expect to open Social Tap Drinkery and Create Kitchens in a 5,680 square-foot space at Braeburn Square (4510 E. 19th St.) on Wichita State University’s campus. Create Kitchens will feature two restaurant spaces - Sungrano Pizza and one to be named later. Both are virtual kitchens with carry-out only and a multitude of ways to order and pay – apps, QR codes, kiosk and in-person.

ATLAS team

March 26, 2021 — Wichita State University’s National Institute for Aviation Research (NIAR) announces the addition of two new technologies to its Automated Technologies Laboratory for Aerospace Systems (ATLAS): a fully integrated thermoplastic welding system and a prepreg tape slitting and tow-rewinding machine.